Owner: City of Mosier Oregon

Engineer: RH2 Engineering

Contract Value: $411,000.00

In the fall of 2021, Odyssey contracted with the City of Mosier Oregon to supply and install a complete booster pump station to replace the outdated “Eastside BPS”. This project included installing underground water suction and discharge piping, construction of a 192 SQ FT block CMU building with wood framed roof structure and commercial double doors. Odyssey’s subcontractor, Northeast Electric of Woodland, WA worked closely with us to install all the required power, lighting, telemetry and controls for the new booster station. Odyssey completed the project within the Cities budget and only experienced minor delays due to the COVID 19 Pandemic because of excellent management on both the field and office ends of the project.

Layer 24.png

You can't build a great building on a weak foundation.  

You must have a solid foundation if you're going to have a strong superstructure.

- GORDON B HINCKLEY

LOGO-IN-WHITE.webp

FOLLOW US

Washington Contractor ODYSSCL835OF

QUICK LINK

OUR LOCATION

12302 NE 117th Ave, Vancouver, WA 98662

Odyssey Contacting LLC. © Copyright 2022 | Designed by Yakima Branding

bottom of page