HERON DRIVE TREATMENT POND

HOME / PROJECTS / HERON DRIVE TREATMENT POND

PORTFOLIO

HERON DRIVE TREATMENT POND

f4e506_9e7ad0b66c0145a0ab5cddfd5f863439_mv2.png

Owner: City of Ridgefield WA

General Contractor: Odyssey Contracting

Engineer: Harper Houf Peterson Righellis Inc

Contract Value: $171,008.00

In the fall of 2019, Odyssey contracted with the City of Ridgefield WA to install a new 10,000 square foot stormwater retention and treatment pond for treating and discharging all the stormwater collected within city limits before it entered Gee Creek. Odyssey installed new access roads, outfall structures and piping, logging and clearing, installing a 30 mil liner in the bottom before completely filling the pond with drain rock and special blend soils. Odyssey provided a quality project to the City at the budget they had put aside for the work while creating a good relationship with the City.

Layer 24.png

You can't build a great building on a weak foundation.  

You must have a solid foundation if you're going to have a strong superstructure.

- GORDON B HINCKLEY

LOGO-IN-WHITE.webp

FOLLOW US

Washington Contractor ODYSSCL835OF

QUICK LINK

OUR LOCATION

12302 NE 117th Ave, Vancouver, WA 98662

Odyssey Contacting LLC. © Copyright 2022 | Designed by Yakima Branding

bottom of page